Mon–Fri 09:00–17:00

East Sussex · Surrey · Kent

Gas Safe Registered

Control panel of a suspended warm air unit heater open during commissioning

Warm Air Heating Systems

Radiant tube, warm air units and ducted distribution for warehouses, factories and workshops, sized to the space rather than to the catalogue.

Heating a big space

Without heating it all

Whether the space is a large industrial unit, a warehouse or a small workshop, the question is the same: how do you get heat where the people and the work are without paying to warm the roof. Radiant tube heaters answer it one way, by heating objects and people in the immediate area rather than the air in the building.

Read moreRead less

We install the full range: radiant tube heating, warm air units floor standing or suspended at height to keep your floor area free, and warm air distributed through ducting. Systems can be zoned so different areas run at different temperatures, and pre-set to start heating at whatever point of the day or night suits the shift pattern.

In tall buildings, destratification units bring the warm air back down and even it out across the floor, and they can be controlled independently of the heaters themselves.

Suspended gas fired warm air unit heater mounted high on a sports hall wall
What is included8
  • Radiant tube heating
  • Floor standing warm air units
  • Suspended warm air units
  • Ducted warm air distribution
  • Destratification units
  • Zoning and time control
  • Servicing and maintenance
  • Gas Safe commissioning

Thermal imaging survey

Heat back on the floor

A site survey at a local factory, using our own thermal imaging equipment, found a 12°C difference between the temperature at high level and the temperature down at the working floor. The heaters were running longer than they needed to, because the room thermostat was waiting for warm air that had already risen out of reach.

We calculated the number of destratification fan units needed to move that air back down, and fitted them. The differential came down to 4°C, the heaters run for shorter periods, and the running cost and the carbon that goes with it came down with them.

Flue gas analyser connected to a warm air unit heater during commissioning
12°CBefore, high to low
4°CAfter destratification

How we work

First call to handover

  1. 01

    Consultation

    We visit the building, survey what is there and scope the work with you.

  2. 02

    Estimate

    A costed proposal written against your budget and your programme.

  3. 03

    Installation

    Installed to specification by our own engineers, tested and handed over.

Recent work in the South East

Warm air projects

Ceiling-mounted warm air heater installed in a commercial workshop
Warm air heater in a workshop
Control panel of a suspended warm air unit heater open during commissioning
Unit heater commissioning
Warm air heating unit connected to distribution ductwork in a church basement
Warm air unit and ductwork

Our services

What else we do

Accredited and registered

Gas Safe Register
CHAS accredited contractor
PQS Pre-Qualification-Scheme, SSIP registered, health and safety approved

PQS certificate NP350717169, valid to 11 July 2027. View the certificate Verify on the SSIP portal

Get in touch

Tell us what you need

And ask about our installation, maintenance and repair services.